ANCHOR FOREMAN 2005 - 2007 National Petroleum Construction Co.
- Feras Al-mahmoud
- Aug 2, 2007
- 1 min read
- On board DLB 1000 at bassine field and heera field
BASSINE Field:
Laying 20" pipeline 7 K/M.
Laying 10" pipeline 8 K/M.
Laying 08”, pipeline and 2" piggyback 9 K/M.
HEERA Field:
Laying 12" pipeline 7.5 K/M.
Laying 10" pipeline 7.5 K/M.
Laying 6" pipeline 2.5 K/M.
Laying 6" flexible pipeline 2.8 K/M.
Laying 6" subsea cable 7.5 K/M.
Laying 6" subsea cable 8.5 K/M.
- On board HLS 2000 at AL KHALEEJ field (QATAR)
Jackets and platforms installation.
- On board DLB-750 at OXY field (QATAR)
Laying 2 OF 12'' oil pipelines with umbilical.
Piggyback.
Laying 2 OF 8" gas pipelines.
- On board DLB-750 at AL SHAHEEN field (QATAR)
Laying 12" pipeline and TIE-IN installation.
- On board DLB-750 at ZAKUM field (UAE)
RISER / TIE-IN installation.