- On board DLB 1000 at bassine field and heera field

BASSINE Field:

Laying 20" pipeline 7 K/M.

Laying 10" pipeline 8 K/M.

Laying 08”, pipeline and 2" piggyback 9 K/M.

HEERA Field:

Laying 12" pipeline 7.5 K/M.

Laying 10" pipeline 7.5 K/M.

Laying 6" pipeline 2.5 K/M.

Laying 6" flexible pipeline 2.8 K/M.

Laying 6" subsea cable 7.5 K/M.

Laying 6" subsea cable 8.5 K/M.

- On board HLS 2000 at AL KHALEEJ field (QATAR)

Jackets and platforms installation.

- On board DLB-750 at OXY field (QATAR)

Laying 2 OF 12'' oil pipelines with umbilical.

Piggyback.

Laying 2 OF 8" gas pipelines.

- On board DLB-750 at AL SHAHEEN field (QATAR)

Laying 12" pipeline and TIE-IN installation.

- On board DLB-750 at ZAKUM field (UAE)

RISER / TIE-IN installation.


 
 
 