BARGE TOWER-ANCHOR OPERATOR. 2000 - 2005 National Petroleum Construction Co.
- Feras Al-mahmoud
- Aug 2, 2000
- 1 min read
- On board DLB-750 UMM-SHAIF field (UAE)
Laying 24" pipeline from USSC to US-23A.
Two 24" RISER / TIE-IN installation.
- On board DLB-750 at BUL-HANINE field (QATAR)
Laying two 8" pipeline.
Laying 12" with power cable.
- On board DLB-750 at AL-KHALLEJ field (QATAR)
Laying 16" pipeline from DP-3 TO DP-4.
Laying 10" pipeline from DP-3 TO DP-2.
10" DP-3 JACKET RISER / TIE-IN.
- On board DLB-750 SOROOSH AND NOROOZ field (IRAN)
Laying 48 KM 24" pipeline (2) lines.
- On board DLB-750 barge at TOTAL ABK ADMA OPCO (ABU DHABI)
RISER installation 2-PLATFORM and through power cable PIGGY back cable into J-TUBE PIPE.
- On board DLB-750 barge ADMA OPCO (ABU DHABI)
RISER and TIE-IN installation 18" GIP platform at ZAKUM field west complex.
- On board DLB-750 TOTAL ABK FIELD (ABU DHABI)
Beach pull and laying 52KM,10" pipeline from ABK field to DAS ISLAND over SIDE for the 10" export line AT KP- 44.
- On board PLB-648 AL SHAHEEN FIELD (QATAR)
Laying cable, TIE-IN, RISERS installation and hook up work.
- On board barge PLB-648 (ABU DHABI)
Setting sleepers pipelines each 14" with power cable at TOTAL ABK field.
- On board barge PLB-648 ADMA OPCO at UMM-SHAIF OIL field (ABU DHABI)
Laying 24" MOL pipeline, RISER installation and HOOK-UP work.
- On board DLB-1000 OCCIDENTAL PETROLUM OF QATAR
JACKET installation at SHARGI field.
- On board DLB-1000 ADMA OPCO (ABU DHABI)
Laying 30" MOL pipeline at ZAKUM field to DAS ISLAND.
Laying 24" MOL pipeline inside ZAKUME field TIE-IN installation and SHOR pull pipe.
Installation of SLEEPER at pipeline crossing.