BARGE TOWER-ANCHOR OPERATOR. 2000 - 2005 National Petroleum Construction Co.

  • Writer: Feras Al-mahmoud
    Feras Al-mahmoud
  • Aug 2, 2000
  • 1 min read

- On board DLB-750 UMM-SHAIF field (UAE)

Laying 24" pipeline from USSC to US-23A.

Two 24" RISER / TIE-IN installation.

- On board DLB-750 at BUL-HANINE field (QATAR)

Laying two 8" pipeline.

Laying 12" with power cable.

- On board DLB-750 at AL-KHALLEJ field (QATAR)

Laying 16" pipeline from DP-3 TO DP-4.

Laying 10" pipeline from DP-3 TO DP-2.

10" DP-3 JACKET RISER / TIE-IN.

- On board DLB-750 SOROOSH AND NOROOZ field (IRAN)

Laying 48 KM 24" pipeline (2) lines.

- On board DLB-750 barge at TOTAL ABK ADMA OPCO (ABU DHABI)

RISER installation 2-PLATFORM and through power cable PIGGY back cable into J-TUBE PIPE.

- On board DLB-750 barge ADMA OPCO (ABU DHABI)

RISER and TIE-IN installation 18" GIP platform at ZAKUM field west complex.

- On board DLB-750 TOTAL ABK FIELD (ABU DHABI)

Beach pull and laying 52KM,10" pipeline from ABK field to DAS ISLAND over SIDE for the 10" export line AT KP- 44.

- On board PLB-648 AL SHAHEEN FIELD (QATAR)

Laying cable, TIE-IN, RISERS installation and hook up work.

- On board barge PLB-648 (ABU DHABI)

Setting sleepers pipelines each 14" with power cable at TOTAL ABK field.

- On board barge PLB-648 ADMA OPCO at UMM-SHAIF OIL field (ABU DHABI)

Laying 24" MOL pipeline, RISER installation and HOOK-UP work.

- On board DLB-1000 OCCIDENTAL PETROLUM OF QATAR

JACKET installation at SHARGI field.

- On board DLB-1000 ADMA OPCO (ABU DHABI)

Laying 30" MOL pipeline at ZAKUM field to DAS ISLAND.

Laying 24" MOL pipeline inside ZAKUME field TIE-IN installation and SHOR pull pipe.

Installation of SLEEPER at pipeline crossing.


 
 
 